Automatic Condensate Drain Price List

You are currently viewing Automatic Condensate Drain Price List
Automatic Condensate Drain Price List

Condensation occur on every part of an air / pneumatic system which in most cases contains contaminants or particles that we don’t to enter our compressed air systems. To remove condensate on the system, we use automatic condensate drains with volume controlled electronics to prevent compressed air loss or we commonly say it as “zero air loss”. The automatic condensate drain price list from flow rate capacity of 2.5 cubic meter / minute up to 130 cubic meter / minute.

The price listed is per one assembly of automatic condensate drain. The price already include value added tax.

For other reference price list for pneumatic or compressed air systems:
– “Zero Air Loss” in compressed air line, please see the link: AUTOMATIC CONDENSATE DRAIN PRICE LIST
– “Oil Free Compressed Air System”, please see the link: CATALYTIC CONVERTER PRICE LIST
– Compressor prices, please see the link: COMPRESSOR PRICE LIST
– Refrigeration dryer prices, please see the link: REFRIGERATION DRYER PRICE LIST
– Pneumatic silencer prices, please see the link: PNEUMATIC SILENCER PRICE LIST
– Pneumatic ball valve prices, please see the link: PNEUMATIC BALL VALVE PRICE LIST
– Polyurethane tube prices, please see the link: POLYURETHANE TUBE PRICE LIST
– Polyamide Tube prices, please see the link: POLYAMIDE TUBE PRICE LIST
– Small size pneumatic cylinder prices, please see the link: PNEUMATIC CYLINDER PRICE LIST
– Large size pneumatic cylinder prices, please see the link: DA PNEUMATIC CYLINDER PRICE LIST

AUTOMATIC CONDENSATE DRAIN PRICE

MAX. COMPRESSOR FLOWRATEPRICE PER UNITREMARKS
2.5 m3 / min27,162.00Standard
5 m3 / min33,366.00Standard
6.5 m3 / min55,725.00Standard
10 m3 / min58,012.50Standard
30 m3 / min76,120.50Standard
130 m3 / min105,862.50Standard
MAX. COMPRESSOR FLOWRATEPRICE PER UNITREMARKS
2.5 m3 / min55,327.50Hard Coated
5 m3 / min70,128.00Hard Coated
6.5 m3 / min98,587.50Hard Coated
10 m3 / min105,547.50Hard Coated
30 m3 / min156,600.00Hard Coated
130 m3 / min218,475.00Hard Coated

FOLLOW US!

We want to improve this website so we need your help. Please send us your recommendations, suggestion, and request. Click this for the SUGGESTION FORM PAGE.

Don’t forget to hit Like and Share if this blog helped you.

FOLLOW US!

Please like and follow our facebook page for social media updates.

https://www.facebook.com/theprojectestimate